For my project
VRF design, supply and installation for projects
Hospitals, hotels, malls and compounds. From load calculation to handover with a commissioning report.

The record
Delivered projects, with name, location and year in service.
- Ibn Sina Specialist HospitalTantaHealthcareSince 2016
- Memphis HospitalDokki, GizaHealthcare
- Dar Elsafwa Medical HospitalEl MahallaHealthcare
- Maxim HotelNasr City, CairoHospitality
- Katameya OneNew CairoResidential
- Ashrafco MallFifth SettlementRetail
- Amin MallNasr CityRetail
- Beit El Asmak RestaurantNasr CityRestaurant
Supply is one thing. Execution is another.
A VRF system is not a product that ships — it is a design, an installation and a commissioning. This is our scope on every project.
Load calculation
Space by space: area, solar exposure and use pattern — not a rule of thumb per square metre.
Pipework and riser design
Lengths, diameters and joint positions resolved before work begins.
Commissioning and testing
Pressure test, charge, and handover with a signed commissioning report.
Single point of responsibility
Supply, installation and warranty from one company.
INTERNATIONALLY CERTIFIED
Valid official certifications — tap to view

MANUFACTURING & APPROVALS
Manufactured for HelioMax
VRF systems built to global standards and internationally certified — we are the official importer for Egypt.
T1 climate class
runs at full capacity even at
43°C
ambient heat
Ready to start?
Message us on WhatsApp now for a free consultation and quote.





