For my project

VRF design, supply and installation for projects

Hospitals, hotels, malls and compounds. From load calculation to handover with a commissioning report.

The record

Delivered projects, with name, location and year in service.

  1. Ibn Sina Specialist HospitalTantaHealthcareSince 2016
  2. Memphis HospitalDokki, GizaHealthcare
  3. Dar Elsafwa Medical HospitalEl MahallaHealthcare
  4. Maxim HotelNasr City, CairoHospitality
  5. Katameya OneNew CairoResidential
  6. Ashrafco MallFifth SettlementRetail
  7. Amin MallNasr CityRetail
  8. Beit El Asmak RestaurantNasr CityRestaurant

Supply is one thing. Execution is another.

A VRF system is not a product that ships — it is a design, an installation and a commissioning. This is our scope on every project.

  1. Load calculation

    Space by space: area, solar exposure and use pattern — not a rule of thumb per square metre.

  2. Pipework and riser design

    Lengths, diameters and joint positions resolved before work begins.

  3. Commissioning and testing

    Pressure test, charge, and handover with a signed commissioning report.

  4. Single point of responsibility

    Supply, installation and warranty from one company.

INTERNATIONALLY CERTIFIED

Valid official certifications — tap to view

MANUFACTURING & APPROVALS

Manufactured for HelioMax

VRF systems built to global standards and internationally certified — we are the official importer for Egypt.

T1 climate class

runs at full capacity even at

43°C

ambient heat

Ready to start?

Message us on WhatsApp now for a free consultation and quote.